Advancing a Facilities Mechanical Career
The career path for a Data Center Facilities Technician (Mechanical) involves continuous growth and specialization, starting from foundational maintenance roles and progressing towards senior leadership or engineering positions. Initially, technicians focus on hands-on tasks, mastering the intricacies of HVAC, plumbing, and fire suppression systems crucial for data center uptime. As experience accumulates, opportunities arise to become a Lead Technician, overseeing junior staff and managing more complex projects. This role demands not only technical expertise but also strong leadership and problem-solving abilities to coordinate maintenance schedules and emergency responses effectively. Further advancement might lead to a Facilities Supervisor or Manager position, where the focus shifts to strategic planning, budget management, vendor relationships, and ensuring compliance with stringent operational and safety standards. Challenges often include keeping pace with rapidly evolving cooling technologies, managing critical infrastructure under immense pressure, and balancing efficiency with redundancy. Overcoming these requires a commitment to lifelong learning, acquiring new certifications, and developing robust analytical skills to anticipate and mitigate potential failures. The ultimate goal for many is to transition into a Facilities Engineer role, designing and optimizing mechanical systems for future data center deployments, requiring advanced engineering knowledge and project management expertise.
Data Center Facilities Technician (Mechanical) Job Skill Interpretation
Key Responsibilities Interpretation
A Data Center Facilities Technician (Mechanical) is pivotal in ensuring the continuous and efficient operation of a data center's physical infrastructure. Their core work revolves around the inspection, maintenance, and repair of critical mechanical systems that regulate the data center environment. This includes diligently managing Heating, Ventilation, and Air Conditioning (HVAC) systems like chillers, cooling towers, and CRAC/CRAH units to maintain optimal temperature and humidity levels, which are paramount for sensitive IT equipment longevity. They are also responsible for the uptime and maintenance of water pumps, piping, and treatment systems, ensuring leak-free operations and efficient fluid dynamics. A critical aspect of their role is to respond swiftly to abnormal conditions and alarms, troubleshooting mechanical issues to minimize downtime and prevent costly outages. Furthermore, these technicians play a vital role in supporting the startup, commissioning, and integration of new mechanical equipment, guaranteeing seamless infrastructure expansion. They meticulously document all maintenance activities, adhere to stringent safety protocols, and actively seek ways to improve operational efficiency and reduce costs. Ultimately, their value proposition lies in their ability to proactively safeguard the mechanical integrity of the data center, directly contributing to the reliability, availability, and overall performance of the housed IT assets. Maintaining optimal cooling and environmental control and executing preventive maintenance programs are among their most critical contributions.
Must-Have Skills
- HVAC System Expertise: This involves a deep understanding of Computer Room Air Conditioners (CRAC) and Computer Room Air Handlers (CRAH), chillers, cooling towers, and associated controls to ensure precise temperature and humidity regulation. Technicians must be able to troubleshoot, maintain, and repair these complex systems to prevent overheating and optimize energy efficiency.
- Piping and Plumbing Systems: Proficiency in maintaining, repairing, and installing piping, pumps, valves, and water treatment systems is crucial to prevent leaks, manage water flow, and support cooling infrastructure. This includes understanding hydraulics and various pumping system types.
- Mechanical Troubleshooting: The ability to diagnose and resolve issues with mechanical equipment efficiently, using schematics, diagnostic tools, and a systematic approach, is paramount. This minimizes downtime and ensures rapid recovery from system failures.
- Preventive Maintenance (PM) Execution: Knowledge and experience in implementing and performing routine preventive maintenance tasks on all mechanical systems are essential. This proactive approach identifies potential problems before they escalate into critical failures, extending equipment lifespan.
- Blueprint and Schematic Reading: The capacity to accurately read and interpret mechanical blueprints, P&ID (Piping and Instrumentation Diagram) drawings, and electrical schematics is vital for understanding system layouts, performing repairs, and supporting new installations.
- Safety Protocols and Procedures: A thorough understanding and strict adherence to safety regulations such as Lockout/Tagout (LOTO), confined space entry, and proper handling of refrigerants are non-negotiable. This ensures a safe working environment for all personnel.
- Basic Electrical Knowledge: While primarily mechanical, an understanding of basic electrical principles, control wiring, motor starters, and VFDs (Variable Frequency Drives) for mechanical equipment is often required for effective troubleshooting and collaboration.
- CMMS/SCADA System Experience: Familiarity with Computerized Maintenance Management Systems (CMMS) or Supervisory Control and Data Acquisition (SCADA) systems is important for monitoring, managing work orders, and documenting maintenance activities.
Preferred Qualifications
- EPA 608 Certification: This certification for refrigerants demonstrates a commitment to environmental responsibility and legal compliance when handling refrigeration systems, making a candidate highly desirable for roles involving HVAC maintenance. It indicates professional competency in managing substances critical to cooling systems.
- Building Management System (BMS) Proficiency: Experience with advanced BMS platforms, including programming and optimization, allows a technician to contribute to more sophisticated facility automation and energy efficiency initiatives. This skill set moves beyond basic operation to system enhancement.
- Advanced Data Center Cooling Technologies: Knowledge or hands-on experience with emerging cooling solutions like liquid cooling (direct-to-chip or immersion cooling) or adiabatic cooling. This showcases a forward-thinking mindset and the ability to adapt to the latest innovations in data center infrastructure.
Ensuring Mechanical Uptime
Ensuring mechanical uptime in data centers is a constant vigilance, a delicate dance between predictive analysis and swift, decisive action. It goes beyond mere repairs; it's about anticipating failure and engineering resilience. A proactive approach involves continuous monitoring of all mechanical systems, leveraging sensors and Building Management Systems (BMS) to detect anomalies before they become critical. Technicians must be adept at interpreting data trends from chillers, CRAC/CRAH units, and pumping systems to schedule preventive maintenance precisely when needed, rather than reacting to breakdowns. The challenge lies in balancing the need for system redundancy with operational efficiency, especially as data centers scale and densities increase. Effective communication within the facilities team and with IT operations is paramount, ensuring that any mechanical work is coordinated to minimize impact on critical services. Developing comprehensive emergency response plans and regularly drilling these scenarios helps to hone reaction times and prevent minor incidents from escalating into widespread outages. Furthermore, investing in modern, energy-efficient mechanical equipment not only reduces operational costs but also enhances overall system reliability, directly contributing to higher uptime. Robust preventive maintenance schedules are the backbone, coupled with rapid fault diagnosis and repair capabilities.
Evolving Data Center Cooling Strategies
The landscape of data center cooling is undergoing a significant transformation, driven by the increasing power density of modern IT equipment and the imperative for greater energy efficiency. Traditional air-cooling methods, while still prevalent, are increasingly being supplemented or replaced by advanced liquid cooling technologies. Direct-to-chip cooling, where coolant circulates directly over heat-generating components, and immersion cooling, which involves submerging entire servers in non-conductive dielectric fluid, are gaining substantial traction. These innovations are crucial for managing the intense heat generated by AI, machine learning, and high-performance computing workloads. Facilities technicians must adapt by acquiring new skills related to these systems, understanding their unique maintenance requirements, and being proficient in managing the associated plumbing and fluid dynamics. The trend towards higher target operating temperatures in data centers also impacts mechanical cooling strategies, requiring precise control and optimization. Integrating AI-powered analytics for real-time thermal management is becoming common, allowing for more precise adjustments and proactive issue identification. This shift demands a continuous learning mindset for technicians to stay current with these rapidly evolving methodologies and ensure the sustained efficiency and reliability of data center operations. Sustainability and energy efficiency are key drivers for these advancements.
Safety and Regulatory Compliance
Safety and regulatory compliance are non-negotiable pillars in data center mechanical operations, safeguarding both personnel and critical infrastructure. The high-powered environment, coupled with complex machinery and potential hazards like refrigerants, mandates strict adherence to established safety standards. OSHA regulations, including those pertaining to electrical safety, fall protection, noise control, and the safe handling of equipment and materials, are fundamental. Facilities technicians must be rigorously trained in procedures such as Lockout/Tagout (LOTO) to prevent unexpected energization during maintenance and repairs of mechanical systems. Understanding environmental refrigerant laws and proper disposal methods is also crucial for technicians working on HVAC systems. Regular safety audits and inspections are essential to identify potential risks and ensure that all mechanical equipment, from pumps to chillers, operates within safe parameters. The documentation of safety training, incident reports, and corrective actions forms a vital record for demonstrating compliance and fostering a culture of safety. Proper use of Personal Protective Equipment (PPE), tailored to specific mechanical tasks, is mandatory to mitigate risks. Ultimately, a proactive approach to safety and compliance not only prevents accidents and injuries but also protects the data center from costly fines, reputational damage, and operational disruptions.
10 Typical Data Center Facilities Technician (Mechanical) Interview Questions
Question 1: Can you describe your experience with maintaining and troubleshooting large-scale HVAC systems, specifically CRAC/CRAH units and chillers, in a critical environment?
- Points of Assessment: Interviewers want to gauge your practical experience with core mechanical systems, your understanding of their function in a critical setting, and your troubleshooting methodology. They are looking for direct, relevant examples.
- Standard Answer: "In my previous role at [Previous Company/Data Center], I was primarily responsible for the preventive and corrective maintenance of multiple CRAC/CRAH units and large industrial chillers. My routine included daily checks of operating parameters, refrigerant levels, and fan motor health. When troubleshooting, I'd typically start by reviewing alarm logs in the BMS, then physically inspect the unit for obvious issues like leaks or abnormal noises. For example, once a CRAC unit was underperforming, and after checking fan speeds and filter cleanliness, I used my gauges to diagnose a low refrigerant charge, which I then rectified according to EPA guidelines. I also have experience with scheduled chiller maintenance, including condenser tube cleaning and compressor overhauls, ensuring optimal cooling capacity and efficiency."
- Common Pitfalls: Candidates might give generic answers without specific examples, overemphasize theoretical knowledge without practical application, or fail to mention critical elements like refrigerant handling or safety.
- Potential Follow-up Questions:
- What specific types of chillers have you worked on (e.g., centrifugal, screw, absorption)?
- How do you ensure proper airflow management within the data hall, beyond the CRAC/CRAH unit itself?
- Describe a time you encountered an unusual or difficult HVAC fault and how you resolved it.
Question 2: How do you approach preventive maintenance for mechanical equipment in a data center, and why is it so crucial?
- Points of Assessment: This question assesses your understanding of proactive maintenance strategies, your organizational skills, and your awareness of the importance of uptime in a data center.
- Standard Answer: "My approach to preventive maintenance (PM) is systematic and adheres strictly to vendor recommendations and industry best practices. I prioritize creating and following detailed PM schedules for all mechanical assets, including daily walk-throughs, weekly checks, monthly inspections, and annual overhauls. For example, for pumps, this would involve checking vibration levels, lubrication, seal integrity, and motor amperage on a regular basis. For cooling towers, it's about water treatment, drift eliminator cleaning, and fan blade inspection. PM is crucial in a data center because it minimizes the risk of unexpected failures, extends the lifespan of expensive equipment, optimizes energy efficiency, and most importantly, directly contributes to maintaining the critical uptime required for business continuity. It shifts from reactive firefighting to proactive prevention."
- Common Pitfalls: Candidates might only list common PM tasks without explaining the 'why', lack a structured approach, or underestimate the impact of PM on data center operations.
- Potential Follow-up Questions:
- How do you use a CMMS (Computerized Maintenance Management System) in your PM activities?
- What are some common indicators that a piece of mechanical equipment is due for PM, even if not on schedule?
- How do you balance PM tasks with urgent reactive maintenance?
Question 3: Explain the Lockout/Tagout (LOTO) procedure and its importance when working on mechanical systems.
- Points of Assessment: This evaluates your adherence to critical safety protocols, specifically for preventing accidental energization or startup of machinery during maintenance.
- Standard Answer: "Lockout/Tagout (LOTO) is a safety procedure used to ensure that dangerous machines are properly shut off and not able to be started up again prior to the completion of maintenance or servicing work. For mechanical systems, this involves identifying all energy sources—electrical, hydraulic, pneumatic, thermal, or mechanical—and isolating them. First, I would notify all affected personnel. Then, I would shut down the equipment, isolate the energy source (e.g., turn off circuit breakers, close valves), apply lockout devices to prevent re-energization, and attach tags to clearly indicate the lockout status and who applied it. I would then verify the isolation by attempting to start the equipment. LOTO is critically important because it prevents accidental startup or release of stored energy, protecting technicians from severe injuries or fatalities during maintenance work. It's a fundamental safety standard in any industrial or data center environment."
- Common Pitfalls: Forgetting key steps in the procedure, understating its importance, or confusing LOTO with simple power-off procedures.
- Potential Follow-up Questions:
- Describe a situation where a mechanical system had multiple energy sources requiring complex LOTO.
- What are the steps for group LOTO, if multiple technicians are working on the same equipment?
- How do you handle residual energy in mechanical systems after lockout?
Question 4: How do you troubleshoot a pump that is vibrating excessively or making unusual noises?
- Points of Assessment: This assesses your practical troubleshooting skills, knowledge of rotating equipment, and ability to diagnose common mechanical issues.
- Standard Answer: "If a pump is exhibiting excessive vibration or unusual noises, my first step would be to ensure my immediate safety. Then, I would conduct a visual inspection, checking for loose mounting bolts, obvious leaks, or obstructions around the impeller. Next, I'd use a vibration analysis tool or a stethoscope to pinpoint the source of the noise or vibration—is it the motor, the coupling, or the pump itself? Common causes I'd investigate include cavitation due to insufficient suction head, bearing failure, impeller imbalance or damage, misalignment between the pump and motor, or even pipework issues. I would systematically check each of these, often starting with alignment and bearing condition, to identify and rectify the root cause, aiming to restore smooth operation and prevent further damage."
- Common Pitfalls: Jumping to conclusions without systematic diagnosis, not mentioning safety, or overlooking common causes like alignment or cavitation.
- Potential Follow-up Questions:
- What are the different types of pump coupling you've worked with and their maintenance considerations?
- How do you perform a laser alignment on a pump and motor?
- What are the signs of cavitation in a pump, and how do you mitigate it?
Question 5: Describe your experience with water treatment systems in a data center or similar facility. Why is proper water treatment important for cooling systems?
- Points of Assessment: This question gauges your knowledge of water chemistry, its impact on mechanical systems, and your understanding of efficiency and longevity.
- Standard Answer: "I have hands-on experience managing water treatment for cooling towers and closed-loop systems, primarily involving chemical dosing and regular testing. My responsibilities included monitoring pH, conductivity, hardness, and alkalinity, and adjusting chemical feed rates for corrosion inhibitors, biocides, and scale inhibitors. For example, I've managed automated chemical feed systems and performed manual shock treatments when necessary. Proper water treatment is absolutely critical for cooling systems because untreated water can lead to significant issues like scaling on heat exchange surfaces, which severely reduces cooling efficiency; corrosion of pipes and equipment, leading to leaks and premature failure; and biological growth (like Legionella), which can be a health hazard and impede heat transfer. Effective water treatment ensures system longevity, maintains optimal thermal performance, and prevents costly repairs or replacements."
- Common Pitfalls: Generic answers about "adding chemicals," lacking specific parameters or reasons for water treatment, or not emphasizing the consequences of poor treatment.
- Potential Follow-up Questions:
- What are the different types of corrosion you might find in a cooling water system and how are they prevented?
- How often do you conduct water quality tests, and what parameters are most critical to monitor?
- Have you worked with reverse osmosis (RO) or deionization (DI) systems for makeup water?
Question 6: How do you read and interpret a P&ID (Piping and Instrumentation Diagram), and why is it important for a mechanical technician?
- Points of Assessment: This assesses your ability to understand complex system layouts and control logic, which is crucial for troubleshooting and maintenance.
- Standard Answer: "A P&ID is essentially a graphical representation of a process system, showing piping, instrumentation, and control components. I interpret them by first identifying the main equipment like pumps, heat exchangers, and tanks, and then tracing the flow of media through the pipes, paying close attention to valves, sensors, and control loops. I look for symbols representing different types of valves (e.g., globe, gate, check), instruments (e.g., temperature transmitters, pressure gauges), and their connections to the control system. For a mechanical technician, the P&ID is invaluable because it provides a comprehensive overview of how a system is designed to operate. It's essential for accurately troubleshooting issues, understanding the impact of maintenance activities, planning modifications, and ensuring that all components are correctly installed and functioning as intended, especially for verifying energy isolation points during LOTO procedures."
- Common Pitfalls: Only defining what a P&ID is without explaining how they interpret it or its practical importance in their daily work.
- Potential Follow-up Questions:
- What are some common symbols you'd expect to see on a P&ID for a data center cooling system?
- How does a P&ID differ from a general plumbing schematic or a block diagram?
- Describe a scenario where referring to a P&ID was critical in solving a complex mechanical problem.
Question 7: What are some common causes of hot spots in a data center, and what mechanical steps would you take to mitigate them?
- Points of Assessment: This question tests your understanding of data center airflow dynamics, cooling efficiency, and proactive problem-solving.
- Standard Answer: "Common causes of hot spots include inadequate cold air delivery to certain racks, hot air recirculation due to improper containment (e.g., gaps in floor tiles, open rack doors), imbalanced airflow from CRAC/CRAH units, or even server equipment configurations that draw air inefficiently. Mechanically, to mitigate hot spots, I would first verify hot/cold aisle containment integrity, sealing any gaps in raised floor tiles, blanking panels, and rack-level enclosures. I would also check CRAC/CRAH unit settings and supply fan speeds to ensure sufficient cold air volume and static pressure. Adjusting perforated tile placement to direct cold air more effectively to high-density racks, inspecting for clogged air filters, and ensuring proper humidity levels are also critical steps. In more persistent cases, it might involve adjusting cooling loop setpoints or investigating potential issues with the CRAC/CRAH unit’s cooling capacity or fan operation."
- Common Pitfalls: Focusing solely on IT equipment without considering mechanical airflow, giving generic solutions without specific mechanical actions, or failing to mention containment strategies.
- Potential Follow-up Questions:
- How would you use temperature sensors and monitoring tools to identify and track hot spots?
- What is the difference between hot aisle and cold aisle containment, and what are their mechanical implications?
- Describe how server fan speeds can interact with the mechanical cooling system to create or alleviate hot spots.
Question 8: How do you handle emergency mechanical failures, such as a major water leak or an HVAC system shutdown, to minimize impact on data center operations?
- Points of Assessment: This assesses your ability to act under pressure, follow emergency protocols, prioritize tasks, and communicate effectively during critical incidents.
- Standard Answer: "In an emergency, immediate response and clear communication are paramount. For a major water leak, my first priority would be to isolate the source of the leak by shutting off the relevant valves, while simultaneously ensuring the safety of personnel and preventing water from reaching critical IT equipment by deploying containment measures. For an HVAC system shutdown, I would immediately assess the scope of the outage, check for local alarms, and then implement predefined emergency procedures, which might include activating redundant cooling units or deploying temporary spot cooling. In both scenarios, I would promptly communicate the incident's status and actions being taken to the operations team and management. My focus is always on rapid fault diagnosis, containment, mitigation, and recovery, aiming to restore stable conditions as quickly and safely as possible while minimizing any impact on data center services."
- Common Pitfalls: Lacking a structured emergency response, not prioritizing safety or critical systems, or failing to mention communication protocols.
- Potential Follow-up Questions:
- What types of redundant cooling systems are you familiar with, and how do they function during an emergency?
- How do you prioritize multiple alarms or mechanical failures during a large-scale incident?
- Describe a time you had to make a critical decision during a mechanical emergency.
Question 9: What is your understanding of sustainable cooling practices in data centers, and how can a mechanical technician contribute to energy efficiency?
- Points of Assessment: This evaluates your awareness of industry trends, environmental responsibility, and your role in optimizing energy consumption.
- Standard Answer: "Sustainable cooling practices focus on reducing the energy and water consumption associated with keeping data centers cool. This includes optimizing existing air-cooling designs, like hot/cold aisle containment, and increasingly adopting advanced solutions such as free cooling, where outside air or water is used when ambient conditions are favorable, and liquid cooling technologies like direct-to-chip or immersion cooling. As a mechanical technician, I contribute significantly to energy efficiency through several actions: meticulously performing preventive maintenance to ensure all HVAC and pumping systems operate at peak efficiency, calibrating sensors for accurate temperature and humidity control, promptly repairing any leaks or inefficiencies, and ensuring proper airflow management to prevent hot spots and reduce fan energy consumption. I also look for opportunities to optimize setpoints and control sequences in the BMS to align with higher allowable operating temperatures for IT equipment, further reducing cooling load."
- Common Pitfalls: Only mentioning general concepts without specific mechanical actions, not connecting actions to energy savings, or being unaware of emerging green cooling technologies.
- Potential Follow-up Questions:
- Have you worked with economizer modes in HVAC systems, and how do they contribute to energy savings?
- What are the challenges of implementing free cooling in different climates?
- How does the efficiency of pumps and motors impact the overall power usage effectiveness (PUE) of a data center?
Question 10: How do you maintain documentation for mechanical systems, and why is accurate record-keeping important?
- Points of Assessment: This assesses your organizational skills, attention to detail, and understanding of how documentation supports operations, compliance, and continuity.
- Standard Answer: "I maintain meticulous documentation for all mechanical systems, utilizing both digital CMMS platforms and physical logs where necessary. This includes detailed records of all preventive maintenance tasks performed, corrective repairs, parts replaced, system modifications, readings from gauges and sensors, and any incidents or alarms. For critical equipment, I also ensure that vendor manuals, warranties, and as-built drawings are readily accessible and updated. Accurate record-keeping is incredibly important for several reasons: it provides a historical overview of equipment performance and issues, which is invaluable for troubleshooting recurring problems and anticipating future failures. It supports regulatory compliance and audits, demonstrates adherence to safety protocols, and facilitates seamless handover between shifts or during personnel changes. Furthermore, good documentation aids in capacity planning, budget forecasting for parts, and optimizing overall operational strategies for mechanical infrastructure."
- Common Pitfalls: Downplaying the importance of documentation, only mentioning basic logs without detailing the scope, or not connecting documentation to operational benefits.
- Potential Follow-up Questions:
- What specific information do you ensure is always included in a work order or maintenance log?
- How do you ensure documentation remains current after system modifications or upgrades?
- Describe a time when accurate documentation helped you solve a critical problem or prevent an issue.
AI Mock Interview
It is recommended to use AI tools for mock interviews, as they can help you adapt to high-pressure environments in advance and provide immediate feedback on your responses. If I were an AI interviewer designed for this position, I would assess you in the following ways:
Assessment One:Mechanical Systems Diagnostics
As an AI interviewer, I will assess your ability to systematically diagnose and troubleshoot complex mechanical issues within data center cooling infrastructure. For instance, I may ask you "Walk me through your troubleshooting process for a CRAC unit that is experiencing intermittent cooling failures and high discharge air temperatures?" to evaluate your fit for the role.
Assessment Two:Emergency Response and Prioritization
As an AI interviewer, I will assess your critical thinking and decision-making under pressure, particularly concerning mechanical emergencies. For instance, I may ask you "You are alerted to a sudden, significant drop in chilled water pressure across the main supply line. What are your immediate actions, and how do you prioritize to prevent data center overheating?" to evaluate your fit for the role.
Assessment Three:Safety and Compliance Application
As an AI interviewer, I will assess your practical understanding and application of safety protocols, specifically in a mechanical maintenance context. For instance, I may ask you "Describe a specific scenario where you would apply a Lockout/Tagout procedure to a mechanical component, detailing each step you would take and the potential hazards you are mitigating." to evaluate your fit for the role.
Start Your Mock Interview Practice
Click to start the simulation practice 👉 OfferEasy AI Interview – AI Mock Interview Practice to Boost Job Offer Success
Whether you're a new graduate 🎓, considering a career switch 🔄, or aiming for a dream role 🌟 — OfferEasy AI Interview helps you practice smarter and shine in every interview.
Authorship & Review
This article was written by Michael Chen, Senior Data Center Facilities Mechanical Expert, and reviewed for accuracy by Leo, Senior Director of Human Resources Recruitment. Last updated: 2025-08
References
Data Center Job Descriptions and Skills
- Data Center Facilities Technician (Mechanical) — Google Careers
- Data Center Facilities Technician, Mechanical @ Google - Teal
- Data Center Facilities Technician, Mechanical at Google in Worldwide | 5 Years + Experience - Outscal
- Data Center Facilities Technician I, Mechanical — Google Careers
- Data Center Facilities Technician I, Mechanical at Google in Worldwide | 2-4 Years Experience - Outscal
- Main Responsibilities and Required Skills for a Data Center Technician - Spotterful
- What Skills You Need to Become a Data Center Technician
- What Does a Data Center Technician Do? Key Responsibilities and Skills
- Data Center Technician Job Description Template - HRBLADE
Data Center Cooling Trends and Best Practices
- [Data Center Trends & Cooling Strategies to Watch in 2025 - AIRSYS North America](https://vertexaisearch.cloud.google.com/grounding-api-redirect/AUZIYQH4sc9tg5m3N7JcHEnw-jecSKQxP8